| Power |
 |
Power
· Seek Power
Feasibility from Andhra Pradesh State Electricity Board (APSEB)*
· Seek approval of APSEB for captive generation, if planned
· Enter into Agreement with an Independent Power Producer (IPP) in case of
going in for purchase of power from private generating stations
* These clearances /
approvals can be obtained through the Single Window services being
operated by the Commissionerate of Industries by filing a Common Application
Form (CAF). Ordinarily the approvals are secured within a period of four weeks.
Power supply
The prospective
entrepreneurs have to register their requisition for HT supply in prescribed
form along with data sheet pertaining to industrial category and application
fee, in the office of the territorial divisional (operation), APSE Board. The
formal feasibility certificate will be issued with in 4 weeks of the
registration on sanction of the scheme the concerned Divisional Engineer
(Operation) will issue notice for payment of Development charges and service
line charges. The consumer has to pay these charges and also enter into an
agreement in the prescribed form to enable the Board to take up the work of
Service line etc. If so required the consumer will be permitted to execute the
works by a licensed
contractor on turn-key basis subject to the condition
prescribed by the Board. After completion of the works, the consumer has to
fulfill the following formalities for release of power supply.
i. The ICD should be
paid in full
ii. The approval of CEIG under rule 63 of IE rules is to furnished
iii. NOC from A.P.Control Board and all other statutory requirements of Licenses
/ Permissions.
The power supply will be
released within in 15 days after fulfilling the above formalities.
General Information:
Computation of
various charges
I. LT Industrial
Services: or part three of C.C.
a. Service line
charges
Rs.1500/- per HP
of load contracted + Rs.99,330/- per KM for LT three phase four wire
line where extension is necessary
b. Service
connection charges: Nil
The consumer has
to provided the weather proof service wires from Over Head line
terminated out side his premises.
c. Consumption
Deposit:
The consumer has
to pay initial consumption deposit calculated Rs.200/- KW of contracted
load
d. Installation of
LT capacitors:
The prospective
LT consumers being induction motors have to install LT Shunt Capacitors
of specified ratings failing which power supply will be released.
II. HT Industrial
Services
a. The voltage at
which supply is to be availed by HT consumers shall be as follows
Contracted Demand (KVA)
Voltage
1. For contacted demand
from 70 to1500 KVA 11,000 Volts
2. For contracted demand from 1501 to 5000 KVA 33,000 Volts
3. For contracted demand
for 5001 and above 1,32,000 Volts or 2,20,000 volts may be decided by the Board
b. Service line
charges
Load charges (per KVA or
CMD) Line charges (per KM)
1. 11 KV Rs.1500/-
Rs.1,06,800/-
2. 33 KV Rs.1500/- Rs.2,04,000/-
3. 132 KV Rs.1500/- Estimate cost
4. 220 KV Rs.1500/- Estimate cost
c. Consumption
Deposit
The HT consumer, shall
in general, deposit with the Board a sum equivalent to estimated three months
charges in cash.
In the case of new
industrial consumers, the Board may accept a sum equivalent to two months
estimated consumption charges consumption deposit for a period of three years
from the date of first release of supply of electricity. On completion of
initial three year period, consumption deposit for the third month shall be
payable.
d. Tariff Rates:
i. Demand charges:
Rs.140/- of Billing per KVA p.m demand
PLUS
ii. Energy charged
for HT Category I & III for
first 1 lakh units
per month - 225 paise per unit next 1 lakh units
per month - 285 paise per unit balance units during
the month - 305 paise per unit
iii. Fuel cost
adjustment - As per existing rates of 24.95 paise per unit from 1.4.97
e. Procedure for
obtaining additional load
In case additional load
is required, the Industry may proceed in the same way as they have proceeded for
obtaining a new HT Service connection.
f. Low power factor
surcharge
The consumers are
required to maintain power factor not less than 0.85 for their installation in
any month fall below 0.85, a surcharge of 2% shall be levied on the months
bill excluding demand charges and customer charges for every drop of 0.01 below
0.85
For further details,
contact
Member Secretary
A.P.State Electricity Board
Vidyutsoudha, Khairatabad
Hyderabad 500 049
Tel:91-040-3396000
Fax:91-040-3399404
* These clearances /
approvals can be obtained through the Single Window services being
operated by the Commissionerate of Industries by filing a Common Application
Form (CAF). Ordinarily the approvals are secured within a period of four weeks.
|